Guide to the Reports of the Boyle Engineering Corporation

Prepared by Jordan M. Deignan and Patricia J. Rettig
Colorado State University Water Resources Archive
A joint effort of the University Libraries and the Colorado Water Institute
Copyright 2012 Colorado State University. All rights reserved.
Finding aid encoded in EAD Version 2002 by Patricia J. Rettig, 2012.
Creator: Boyle Engineering Corporation
Title: Reports of the Boyle Engineering Corporation
Dates: 1964-2007
Bulk Dates: 1980-1995
Quantity: 22.5 linear feet (15 record cartons)
Identification: WBOY
Abstract: The Boyle Engineering Corporation has been a leader in the delivery of water and wastewater services since the early 1940s. In February 2008, Boyle Engineering was bought out by AECOM. The collection mainly contains material created by Boyle Engineering, such as reports for both private and governmental projects, focusing on water supply, wastewater, and flood control.
Contact Information: Water Resources Archive
Archives and Special Collections
Morgan Library
Colorado State University
Fort Collins, Colorado 80523-1019 USA
Phone: 970-491-1844
Fax: 970-491-1195
Email: library_dl_specialcollections@mail.colostate.edu
URL: https://lib.colostate.edu/water
Restrictions on Access
There are no access restrictions on this collection. However, it is stored off-site, so advance notice is required.
Restrictions on Use
Not all of the material in the collection is in the public domain. Researchers are responsible for addressing copyright issues.
This collection is indexed under the following headings in the Colorado State University Libraries online catalog. Researchers seeking materials about related subjects, persons, organizations, or places should search the catalog using these headings.
Subjects:
  • Water resources development.
  • Water-supply.
  • Flood control.
  • Drainage.
  • Sewerage.
Organizations:
  • Boyle Engineering Corporation.
Places:
  • Colorado.
  • California.
  • Texas.
  • New Mexico.
  • Nevada.
  • Nebraska.
The Boyle Engineering Corporation, created in the early 1940s, specialized in drinking water, wastewater treatment, water-resource management, and storm water. In February 2008, Boyle Engineering was bought out by AECOM, a global provider of professional technical and management support services in the markets of transportation, facilities, environmental, and energy. Prior to the buyout, Boyle Engineering was headquartered in Newport Beach, California, with a branch in Lakewood, Colorado, and employed more than 600 people.
This collection consists of documents dated 1964 to 2007, with the bulk falling from 1980 to 1995. The majority of the material is bound reports by the Boyle Engineering Corporation relating to both private and governmental water studies and projects. Most of the reports contain projections, designs, feasibility models, and development plans in relation to a given city, state, or country. There are nine folders with reports dedicated to water projects in Egypt and Jordan. The rest of the reports are related to specific states, the majority being California and Colorado. There are only a few reports not done by Boyle Engineering. Most contain maps either in the report, or folded up in the back. Three reports contain floppy disks.
Arrangement of the material is alphabetical by categories of state, country, or miscellaneous, and chronologically within each category.
The collection consists of 1 series in 15 boxes:
Preferred Citation

Reports of the Boyle Engineering Corporation, Water Resources Archive, Colorado State University.

Acquisition

The Reports of the Boyle Engineering Corporation were acquired by the Water Resources Archive at Colorado State University in July 2010.

Processing

Processing was completed in January 2012. Materials were rehoused in acid-free boxes and folders. The majority of the materials were left in their original bound state. Documents in three-ring binders were removed from the binders. Duplicates beyond two copies and reports not related to Boyle Engineering were removed from the collection. Maps within reports were left in their original position. Floppy disks were left in their protective sleeves inside the reports and noted in the inventory.

Related Collections

Three folders contain material on the Platte River Research Cooperative Agreement and are related to the Records of the Platte River Whooping Crane Maintenance Trust, Inc.

Note: Title information supplied by the archivist is bracketed. Estimated pagination is preceded by an "e."

Series 1: Engineering reports, 1964-2007

Box Folder
1 Arizona.
1 1 Storm Drainage and Flood Control Study Southeastern Maricopa County State of Arizona. 1973 June. e50pp.
1 2 Central Avra Valley Water Supply Project Preliminary Study and Summary Project, City of Tucson. 1978 June. e100pp.
1 3 Willow Springs Campground. 1980 June. e75pp.
1 4 Adobe Dam Visitor Kiosk Information, New River and Phoenix City Streams Flood Control Project. 1980 October. e60pp.
1 5 Draft Report: Feasibility of Nonstructural Flood Control Measures, Tucson and Vicinity Pima County. 1981 July. e80pp.
1 6 Drainage Study 56th Street Storm Drain System. 1982 February. e50pp.
1 7 Draft: Sediment Inflow Report for Cave Creek and Cudia City Wash at the Arizona Canal Diversion Channel. 1982 May. e40pp.
1 8 Flood Control Study of Bullhead City, Riviera Communities, Mohave County, Arizona. 1985 April. e90pp.
1 9 Preliminary Design Report Siphon Drop Power Plant Rehabilitation, Yuma County Water User's Association. 1985 November. e50pp.
1 California.
1 10 An Investigation of Flood Control and Water Conservation Deficiencies Within Orange County, California. 1964 April. e150pp.
1 11 Flood Control Study Zone II Ventura County Flood Control District, Preliminary Investigation Report. 1965 August. e200pp.
1 12 Design Report for Poway Water Storage Project and Addendum No. 1. 1970 May-June. e100pp.
1 13 [Jalama Creek Proposed Dam]. c. 1971. e30pp.
1 14 Olivenhain Municipal Water District, Standard Specifications and Drawings. 1973 November. e115pp.
1 15 Supplemental Engineering and Economic Report on Proposed Irrigation Project Based on Amended Plan of Irrigation Works as Modified December 1973, Cawelo Water District. 1974 January. e50pp.
1 16 General Plan for Flood Control and Storm Drainage Improvements for Los Chollas Creek Drainage Basin (Lemon Grove Area) Zone 3. 1974 November. e200pp.
1 17 Revised Plan of Works of Sewage Collection, Treatment, and Disposal Facilities: Improvement District No. 1A (Sewer), Moulton Niguel Water District. 1974 December. e30pp.
1 18 Revised Plan of Works of Sewage Disposal Facilities: Improvement District No. 4-A (Sewer), Moulton-Niguel Water District. 1974 December. e30pp.
1 19 Comprehensive Plan for Flood Control and Drainage: Hydrologic Analysis, Zone 3 San Diego County Flood Control District. 1975 August. e200pp.
1 20 Comprehensive Plan for Flood Control and Drainage, Zone 3 San Diego County Flood Control District. 1975 August. e70pp.
1 21 Construction Plans for Construction of West Feeder Unit 1 Contract 1-2: Antelope Valley-East Kern Water Agency. 1975 October. e50pp.
1 22 Engineers Report for Assessment District No. 74-2 (Victoria/Telephone): City of San Buenaventura. 1976 February 9. e50pp.
1 23 Contract Documents for the Construction of Las Posas Road Drain Project, City of San Marcos, San Diego County. 1976 August. e150pp.
2 1 Contract Documents for Furnishing of Leona Valley Pumping Units Contract 3-1/C: Antelope Valley-East Kern Water Agency. 1976 October. e50pp.
2 2 Contract Documents for Furnishing of Leona Valley Pumping Units Contract 3-1/A: Antelope Valley-East Kern Water Agency. 1977 January. e175pp.
2 3 Standard Specifications for Domestic Water System: Los Alisos Water District Orange County, California. 1977 January. e40pp.
2 4 Standard Specifications for Domestic Water System and Sanitary Sewer System: South Coast County Water District. 1977 February. e50pp.
2 5 Fairview Regional Park: General Development Plan Report Environmental Management Agency County of Orange. 1977 March. e75pp.
2 6 Preliminary Design Report Diemer Intertie: Municipal Water District of Orange County. 1977 June. e125pp.
2 7 Contract Documents for Telemetry and Control System Request for Proposals: South Coast County Water District. 1977 August. e75pp.
2 8 Facilities Plan and Project Report for Las Virgenes Municipal Water District and Triunfo County Sanitation District on Calabasas Reclaimed Water Line and Solids Handling and Disposal System: Los Angeles County and Ventura County. 1977 August. e275pp.
2 9 Plan of Work for Improvement District No. 2, No. 8, and No. 9A. 1978 February. e25pp.
2 10 Diemer Intertie Contract 2: Contract Documents Construction Specifications Municipal Water District of Orange County Water Facilities Corporation. 1978 November. e250pp.
2 11 Diemer Project: Construction Administration Procedures Manual, Municipal Water District of Orange County. c. 1979. e200pp.
2 12 Interim Debris Basins on San Diego Creek Prepared for the Irvine Company. 1979 September. e35pp.
2 13 Contract Documents for Construction of East Feeder Contract 3-7: Antelope Valley - East Kern Water Agency. 1980 April. e130pp.
2 14 Contract Documents for Construction of Ridgecrest Housing Off-Site Drainage Improvements: China Lake Investments, Ltd., Kern County. 1980 May. e110pp.
2 15 Chula Vista Golf Course Drainage Study Draft. 1980 May. e60pp.
3 1 Agricultural Suitability and Economic Feasibility Investigation for Woodcrest Agricultural Preserve, Number 6 Riverside County. 1980 June. e80pp.
3 2 Sand and Gravel Mining Guidelines: U.S. Army Corps of Engineers Los Angeles District. 1980 July. e55pp.
3 3 Chula Vista Golf Course Drainage Study Final Report. 1980 August. e45pp.
3 4 Rosendale-Rio Bravo Water Storage District Report on Groundwater Recharge Project: Kern County. 1980 October. e35pp.
3 5 Feasibility Study of Energy Recovery Opportunities: Cucamonga County Water District. 1980 October. e100pp.
3 6 Preliminary Report Flood & Sediment Control Study for the San Pasqual Valley. 1980 November. e70pp.
3 7 Piping and Valve Selection Guidelines. 1980 November. e125pp.
3 8 Drainage Study for Lake Calavera Hills Development for Rick Engineering Company. 1980 November. e15pp.
3 9 Final Environmental Impact Report Hidden Hills Agricultural Development Project: County of Inyo. 1981 January. e100pp.
3 10 Manual No. 1 Project Procedures Guidelines for the Orange County Office. 1981 January. e50pp.
3 11 Draft Majestic Pines Geohydrologic and Water Supply System Study: County of San Diego. 1981 February. e70pp.
3 12 Majestic Pines Geohydrologic and Water Supply System Study for the County of San Diego. 1981 April. e90pp.
3 13 Contract Documents, Construction Specifications at Mt. Diablo Base and Meridian. 1981 August. e50pp.
3 14-15 Investigation of Elevated Groundwater, and Investigation of Elevated Groundwater Conditions and Subsurface Drainage Alternatives: City of Irvine, Orange County. 1981 September 24. e170pp.
3 16 Engineer Letter Report Los Coches Creek Flood Control Project. 1981 November. e125pp.
3 17 Drilling and Construction of Irvine Ranch Water District Reclaimed Water Injection - Extraction Well and Monitoring Well. 1981 November. e125pp.
3 18 Best Management Practices Plan for Sediment Control: City of Irvine and the Southern California Association of Governments. 1981 November. e115pp.
3 19 Evaluation of Reclaimed Water Use at San Mateo Municipal Golf Course. 1982 February. e80pp.
3 20 Plan for Flood Control and Storm Drainage: City of Rancho Mirage. 1982 March. e40pp.
3 21 Hydrologic and Hydraulic Analysis Long Canyon Watershed, Bonita Long Canyon Estates. 1982 March. e25pp.
3 22 Drafting and Sheet Layout Standards: Orange County. 1982 June. e75pp.
3 23 Los Penasquitos Lagoon Watershed Management Plan. 1982 June. e125pp.
3 24 Southridge Village Development Reconnaissance Investigation for Fontana Lateral Channel Improvements. 1982 August. e40pp.
4 1 Preliminary Design Study, Irvine Ranch Water District, Dyer Road Well Field Project. 1983 January. e130pp.
4 2 Tustub Water Service Management Program Phase I Final Report. 1983 February. e100pp.
4 3 Conceptual Feasibility Study: Modeling, Simulation, Optimization MWD Water Distribution System: The Metropolitan Water District of Southern California. 1983 April. e80pp.
4 4 Agricultural Development Feasibility Investigation for Simon Newman Ranch: Stanislaus & Merced Counties: Draft Report. 1983 May. e250pp.
4 5-10 Reports Relating to the Newport Bay Watershed, San Diego Creek Comprehensive Storm Water Sedimentation Control Plan. 1980 December-1983 August. e675pp.
4 11 Miller-Kramer Basin System Joint-Use Study: County of Orange Environmental Management Agency. 1983 September. e50pp.
4 12 Agricultural Development Master Plan Investigation for Adobe Ranch: Madera County. 1983 October. e200pp.
4 13 California's Water Future Impacts on Orange County. 1984 January. e25pp.
4 14 Piping, Valve and Mechanical Equipment Data, Orange County. 1984 May. e110pp.
4 15 Santa Maria Valley Groundwater Study, and Sutherland Reservoir Analyses: Ramona Municipal Water District. 1984 October. e75pp.
4 16 Conjunctive Use of Surface and Ground Waters - The California Experience by Jack J. Cole. 1986. e30pp.
4 17 Castroville Irrigation and Fort Ord-Marina Water Supply Project: Work Tasks B and C5. 1987 April. e60pp.
4 18 Final Draft Report on Santa Rosa Groundwater Basin Management Plan, Prepared for City of Thousand Oaks Camrosa County Water District [copy]. 1987 June 26. e125pp.
5 1 Standard Specifications for the Construction of Water Mains and Facilities, Olivenhain Municipal Water District. 1987 December. e125pp.
5 2 Contract Documents for the Construction of South Feeder Tank Farm Extension Contract 5-5, Antelope Valley East Kern Water Agency, Los Angeles, Kern and Ventura Counties. 1988 January. e100pp.
5 3 South Orange County Regional Water Facilities Investigation Consultation Review Report. 1988 February. e150pp.
5 4 Report on Groundwater Recharge Project, Kern County, Rosendale-Rio Bravo Water Storage District. 1988 June. e40pp.
5 5 Update Report Flood and Sediment Control Study for San Pasqual Valley, City of San Diego. 1988 July. e45pp.
5 6 Contract Documents and Construction Specifications for Construction of Twin Lakes Tank No. 2 and Existing Tank & Pump Station Modifications, Las Virgenes Municipal Water District. 1988 September. e100pp.
5 7 Preliminary Design Report, Sweetwater Reservoir Urban Runoff Diversion System (Initial Work). 1989 April. e115pp.
5 8 Corrosion Control Design Data, Orange County. 1989 May. e130pp.
5 9 Demonstration of Emerging Irrigation Technologies Second Semiannual Progress Report, Submitted to the State of California Department of Water Resources/Water Conservation Office. 1989 December 31. e200pp.
5 10 Draft: Sepulveda Basin Recreation Lake Management Plan, City of Los Angeles. 1990 February. e75pp.
5 11 Preliminary Design Report for South Side Diversion Pond and Low-Flow Interceptor, Sweetwater Reservoir Urban Runoff Diversion System. 1990 April. e80pp.
5 12 Arroyo Pasajero Drainage and Sediment Control Plan Final Report. 1990 July. e200pp.
5 13 Tailwater Recovery Demonstration Program Study Special Technical Report, Imperial Irrigation District. 1990 September. e160pp.
5 14 Model Update and Future Hydrologic Analyses, Salinas Valley Ground Water Model. 1990 November. e75pp.
5 15 Brackish Groundwater Reclamation Study, Metropolitan Water District of Southern California - Vol. III, Executive Summary. 1991 April. e20pp.
5 16 City of Long Beach Storm Drain Master Plan and Management Program Volume 1 Master Plan. 1991 June. e60pp.
5 17 Desalination for Urban Water Supply, California Urban Water Agencies. 1991 July. e50pp.
5 18 Reclaimed Water Facilities System Study for the Olivenhain Municipal Water District. 1991 August. e25pp.
6 1 Demonstration of Emerging Irrigation Technologies Progress Report No. 12: State of California Department of Water Resources. 1991 September 30. e25pp.
6 2 Construction Administration Procedures Manual, Second San Diego Aqueduct Pipeline 4B Phase I. 1991 November. e150pp.
6 3 Urban Runoff Diversion System, Phase II: Sweetwater Authority. c. 1991. e50pp.
6 4 Feasibility Study Alternative Sources of Water Supply Methods of Reducing Demand Draft Report: Mammoth County Water District. 1992 January. e150pp.
6 5 San Joaquin-Tulare Conjunctive Use Model. 1992 February 21. e15pp.
6 6 Hydraulic Analysis of San Juan Creek: City of San Juan Capistrano Design of a New Bridge for the Atchison, Topeka and Santa Fe Railroad Over San Juan Creek. 1992 June. e60pp.
6 7 Runoff Management Plan: San Joaquin Hills Transportation Corridor. 1992 July. e110pp.
6 8 Master Drainage Plan for the San Joaquin Hills Transportation Corridor. c. 1992. e300pp.
6 9 Pipeline 4B - Phase 1 (P4B1) Progress Reports Prepared for San Diego County Water Authority. 1993 June-July. e60pp.
6 10 Runoff Management Plan for the San Joaquin Hills Transportation Corridor: Vol. I. 1993 July 1. e250pp.
6 11 Runoff Management Plan for the San Joaquin Hills Transportation Corridor: Vol. II. 1993 July 1. e200pp.
6 12 Runoff Management Plan for the San Joaquin Hills Transportation Corridor: Appendix AA. 1993 July 1. e125pp.
6 13 Supplement to: Runoff Management Plan for San Joaquin Hills Transportation Corridor. 1994 January 14. e200pp.
6 14 Traffic Impact Analysis High Street/Spring Street Connection: Murray Hill Project, La Mesa, California. 1994 July. e60pp.
6 15 Ground Water Development Plan: Long Beach Water Department Draft Plan. 1994 August. e120pp.
6 16 Ground Water Development Plan: Long Beach Water Department Final Report. 1995 January. e180pp.
6 17 Demonstration of Selenium Removal from Agricultural Wastewater Final Report, Panoche Drainage District, CA. 1995 August. e140pp.
6 18 Safe Yield Study Beaumont Storage Unit: San Gorgonio Pass Water Agency. 1995 October 31. e75pp.
6 19 Technical Specifications Wellhead Treatment Improvements at Pump Station Nos. 153 and 289: City of Fresno. 1997 February. e75pp.
7 Colorado.
7 1 Mined Land Reclamation Permit (112) for Table Mountain Quarries, Inc. 1978. e20pp. Mainly maps
7 2 Mining and Reclamation Permit Application for the Morrison Quarry. 1978. e25pp.
7 3 An Engineering Study for Wastewater Disposal Methods for Southwest Metropolitan Water and Sanitation District. 1980 December. e40pp.
7 4 Preliminary Design Report - Phase I Meadwood Channel Improvements Draft: Aurora, Colorado. 1981 October. e50pp.
7 5 Preliminary Design Report - Phase I Meadwood Channel Improvements Final: Aurora, Colorado. 1981 November. e50pp.
7 6 City of Northglenn Wastewater System Park Construction Company - Accelerated Schedule and Proposed SC-101 Change Orders. 1982 March 11. e60pp.
7 7 Preliminary Design Report - Phase II Meadwood Channel Improvements: Aurora, Colorado. 1982 July. e35pp.
7 8 Campus Irrigation Master Plan University of Colorado - Boulder, Department of Facilities Management Final Report by Key and Company. 1983 January 18. e75pp.
7 9 Contract Documents for the Construction of Major Drainage Improvements Woodglen No, 7: City of Thornton. 1984 July. e100pp.
7 10 Users Manual for the Colorado Urban Hydrograph Procedure Computer Program - PC Version (Chupe/PC): Urban Drainage and Flood Control District. 1985 January. e100pp. + 3.5 and 5.25 inch disks
7 11 Supplement to Agreement Concerning the Windy Gap Project and the Azure Reservoir and Power Project. 1985 March. e15pp.
7 12 Users Manual for the Urban Drainage Storm Water Management Model - PC Version (UDSWM2-PC): Urban Drainage & Flood District. 1985 March. e100pp. + 5.25 inch disks
7 13 Application of a Finite Element Model for Ground Water Resource Appraisal in the Cherry Creek Basin, Denver, Colorado. c. 1985. e20pp.
7 14 Development Work for the Gabriel Reservoir by Western Engineers. 1986 January. e10pp.
7 15-17 Informal Report of the Evaluation of Alternatives for Outfall Systems: Boulder Gunbarrel Area (Report, Appendix A, Appendix B). 1986 February. e250pp.
7 18 Cherry Creek Well Field Study for Denver Water Department. 1986 March. e175pp.
7 19 1985 Development Work for the Fraser Valley Project by Western Engineers. 1986 April. e75pp.
7 20 Engineering Evaluation of the Domestic and Fire Protection Water Systems Federal Correctional Institution Englewood (Littleton) Colorado. 1986 August. e125pp.
7 21 Task A Report On-Farm Water Requirements: Agricultural Engineering Study, Southern Ute & Ute Mountain Ute Indian Reservations. 1986 September. e120pp.
7 22 Historic Use and Consumptive Use of the Burch and Longwill Ditch, Dolores Water Conservatory District by Tipton and Kalmbach. 1986 October. e30pp.
7 23 Historic Use and Consumptive Use of the Keystone Ditch, Dolores Water Conservatory District by Tipton and Kalmbach. 1986 October. e30pp.
7 24 Agronomy Study: Southern Ute & Ute Mountain Ute Indian Reservations. 1986 December. e275pp.
8 1-2 Watershed and River Analysis C.S.U. Short Course Parts I and II: Daryl B. Simons and Ruh-Ming Li. c. 1986. e600pp.
8 3 Chen & Associates Design Level Geotechnical Study Proposed Drop Structure, South Platte River at 88th Avenue: Adams County. 1987 January 13. e25pp.
8 4 Report on Technical Feasibility and Estimated Costs of Reducing the Nitrate and Other Constituent Concentrations in the City's Groundwater Supply, Prepared for the City of Brighton. 1987 March. e50pp.
8 5 University of Colorado East Campus Floodproofing Study, Prepared by WRC Engineering. 1987 April. e80pp.
8 6 Animas & Florida Watersheds Final Report, Design & Cost Estimate for Off-Farm Irrigation Facilities & PIA Determination: Agricultural Engineering Study Southern Ute & Ute Mountain Ute Indian Reservations. 1987 June. e40pp.
8 7 La Plata Watershed Final Report, Design & Cost Estimate for Off-Farm Irrigation Facilities & PIA Determination: Agricultural Engineering Study Southern Ute & Ute Mountain Ute Indian Reservations. 1987 June. e75pp.
8 8 Mancos Watershed Task D & E Final Report, Design & Cost Estimate for Off-Farm Irrigation Facilities & PIA Determination: Agricultural Engineering Study Southern Ute & Ute Mountain Ute Indian Reservations. 1987 June. e150pp.
8 9 McElmo and Navajo Watersheds Final Reports, Design & Cost Estimate for Off-Farm Irrigation Facilities & PIA Determination: Agricultural Engineering Study Southern Ute & Ute Mountain Ute Indian Reservations. 1987 June. e60pp.
8 10 Piedra Watershed Final Report, Design & Cost Estimate for Off-Farm Irrigation Facilities & PIA Determination: Agricultural Engineering Study Southern Ute & Ute Mountain Ute Indian Reservations. 1987 June. e50pp.
8 11 San Juan East Watershed Final Report, Design & Cost Estimate for Off-Farm Irrigation Facilities & PIA Determination: Agricultural Engineering Study Southern Ute & Ute Mountain Ute Indian Reservations. 1987 June. e50pp.
8 12 San Juan Watershed Final Report, Design & Cost Estimate for Off-Farm Irrigation Facilities & PIA Determination: Agricultural Engineering Study Southern Ute & Ute Mountain Ute Indian Reservations. 1987 June. e20pp.
8 13 Ute Mountain Ute La Plata Watershed Final Report, Design & Cost Estimate for Off-Farm Irrigation Facilities & PIA Determination: Agricultural Engineering Study Southern Ute & Ute Mountain Ute Indian Reservations. 1987 June. e20pp.
8 14 Interim Report for the San Miguel Project Feasibility Study: San Miguel Water Conservatory District. 1988 February. e50pp.
8 15 Summary Report Methodology for Denver Metropolitan Area Ground Water Availability Study. 1988 April. e60pp.
8 16 San Miguel Water Supply Study, Data Collection Report. 1990 January. e60pp.
8 17 Geotechnical Investigation Report, U.S. Highway 40 Relocation, Wolford Mountain Reservoir Project, Ritschard Dam: The Colorado River Water Conservation District. 1991 January. e75pp.
8 18 Major Drainageway Planning, Lower Slaughterhouse Gulch, Phase A Report: Urban Drainage and Flood Control District City of Littleton. 1992 July. e75pp.
8 19 Major Drainageway Planning, Upper Lena Gulch, Phase A Report: Jefferson County. 1993 January. e100pp.
9 1 Preliminary Design Report for Reverse Osmosis Treatment Plant: Las Animas. 1994 June. e60pp.
9 2 Rio Grande Project Field Trip Photographic Record: Rio Grande Project Conveyance System Task Order No. 1, Part 2. 1996 October 15-16. e30pp.
Colorado, Texas, and New Mexico
9 3-5 Draft Report for the Water Conservation/Supply Study, Platte River Research Cooperative Agreement. 1999 August 9. e500pp.
9 6 Draft Water Action Plan, Platte River Research Cooperative Agreement. 2000 March. e90pp.
9 7 Reconnaissance - Level Water Action Plan, Platte River Research Cooperative Agreement. 2000 September 14. e110pp.
9 8 Structural Calculations Check of Flood Control Box Culvert at Simms Street for Reduced Concrete Strength: Weaver Creek. 2000 December. e75pp.
9 9 State Highway No. 12 Drainage Analysis Report. 2001 October. e90pp.
9 10 Cherry Crest West Outfall Design Calculations. 2002 January. e75pp.
9 11 South Tributary of Slaughterhouse Gulch - Phase 2 Design Calculations. 2003 March 13. e60pp.
9 12 Colorado River Return Reconnaissance Study Summary Report. 2003 November 14. e30pp.
9 13 Colorado River Return Reconnaissance Study. 2003 November 14. e200pp.
9 14 Preliminary Environmental Evaluation of the Colorado River Return Reconnaissance Study. 2003 November. e100pp.
9 15 Drainage Report for FCC-Florence, Colorado. 2004 June 4. e50pp.
9 16 Reconnaissance Study, Blue River Pumpbacks and Alternatives Summary Report. 2007 October. e140pp.
9 Florida.
9 17 The City of Pensacola Water System Study. 1980 October. e45pp.
9 18 Ocala Water System Master Plan. 1983 February. e50pp.
9 19 Fort Meyers Water System Master Plan Phase Two. 1985 May. e180pp.
9 Kansas.
9 20 Southeast Kansas Water Supply Study, Plans of Regional Water Supply Systems: Cooperative Study Between the USDA Soil Conservation Service and the Kansas Water Resources Board. 1980 January. e210pp.
9 21 Earth Dams: Peyton Creek. 1982 August. e50pp.
9 Nebraska.
9 22 Little Blue Water Resources Project Prefeasibility Engineering and Economic Report on Proposed Plan of Irrigation Development. 1976 September. e150pp.
10 1 Big Sandy Creek Watershed Hydrologic Analysis. 1979 February. e20pp.
10 2 Big Sandy Creek Watershed Master Plan of Surface Water Development: Little Blue Natural Resources District. 1979 July. e80pp.
10 3 Contract Documents for Construction of Surface Water Development Structure 20-6-7 Big Sandy Creek Watershed, Clay County: Little Blue Natural Resources District. 1981 May. e100pp.
10 4 Little Blue Natural Resources District Central Nebraska Public Power and Irrigation District, Adams County Water Supply Study. 1983 April. e75pp.
10 5 Draft Landmark Project Hydrologic Report for Upper Big Blue Natural Resources District. 1987 July. e65pp.
10 6 Central Nebraska Public Power and Irrigation District Groundwater Recharge Fee Assessment Case Study. 1993 October 7. e40pp.
10 7 U.S. Army Corps of Engineers Omaha District Platte River Confluence Study Missouri River Mile 595. 1993 October. e40pp.
10 8 Final Report Niobrara River Sedimentation Impacts Study HEC-6 Revision. 1993 December. e35pp.
10 9 Tobacco Island Project Missouri River Fish and Wildlife Habitat Mitigation Missouri River Miles 586.2-589.4: Cass County, Nebraska. 1994 September. e125pp.
10 10 Final Report Papillion Creek HEC-1F Model for Real-Time Flood Forecasting: Papillion Creek Basin, Nebraska. 1995 January. e70pp.
10 Nevada.
10 11 North Las Vegas Drainage Control Improvement Study Hydrologic Analysis: City of North Las Vegas, Clark County. 1980 May. e20pp.
10 12 North Las Vegas Drainage Control Improvement Project Preliminary Report: City of North Las Vegas, Clark County. 1980 June 18. e80pp.
10 13 City of North Las Vegas Drainage Improvement Project: Clark County. 1980 July. e90pp.
10 14 Drainage Study for Regional Transportation Commission Approved Street Projects in the Northwest Portion of the City of Las Vegas Hydrologic Analysis: Clark County. 1980 July. e75pp.
10 15 Drainage Study for Regional Transportation Commission Approved Street Projects in the Northwest Portion of the City of Las Vegas Preliminary Report: Clark County. 1980 July. e40pp.
10 16 Groundwater Monitoring for the Southern Desert Correctional Center, Clark County, Nevada. 1980 September. e15pp.
10 17 Drainage Study for the Northwest Portion of the City of Las Vegas: Clark County. 1980 September. e85pp.
10 18 Pre-Design Report for the Protection of the Las Vegas Valley Lateral From Las Vegas Wash Erosion: State of Nevada Colorado River Commission. 1985 May. e150pp.
10 19 Design Report for the Meadows Detention Basin: City of Las Vegas. 1987 February. e80pp.
10 20 Facilities Plan for Hiko Springs and Unnamed Wash Laughlin - Big Bend Area: Clark County. 1989 May. e110pp.
10 21 Stormwater Facility Resource Manual. 1990 October. e30pp.
10 22 Range Wash Sediment Transport. 1991 December. e25pp.
10 New Mexico.
10 23 Watershed Yield and Spillway Capacity Requirements Carrizo Creek Reservoir Development Mescalero Indian Reservation Lincoln and Otero Counties, New Mexico. 1968 November. e50pp.
10 24 Cienegita Reservoir Dam and Appurtenances for Mescalero Apache Tribe. 1971 June. e75pp.
10 25 Comprehensive Plan 1976 Ruidoso - Ruidoso Downs. 1976 June. e55pp.
11 1 Design Report for the Ladera Storm Drainage Diversion and Detention Facility: Albuquerque Metropolitan Arroyo Flood Control Authority. 1978 January. e35pp.
11 2 Results of Rate Study for Water Supply and Sewerage Services: City of Albuquerque. 1978 June 7. e200pp.
11 3 Design Report Cienegita Project Section 1. 1979 February 16. e30pp.
11 4 Ground Water Availability Village of Ruidoso: Lincoln County. 1980 October. e45pp.
11 5 Summary of the Water & Sewer Rates Fiscal Year 1981-1982 Vol. 1-2. 1980. e110pp.
11 6 Municipal Water Sources for the Village of Ruidoso: Lincoln County. 1981 February. e55pp.
11 7 Engineering, Flood and Operational Studies for Water Development Plan, Rinconada Unit Rio Hondo Basin, Mescalero Apache Indian Reservation. Prepared for Bureau of Indian Affairs. 1983 March. e55pp.
11 8 Storm Drainage Improvements Phase I, Interim Report No. 1 Determination of Level of Protection: City of Clovis, Curry County. 1989 March. e15pp.
11 9-10 Design Report Storm Drainage Improvements, Ingram Lake New Pond and Interconnecting Channels Vol. 1-2: City of Clovis, Curry County. 1990 July. e250pp.
11 11-12 Conjunctive Water Resource Management Technical Data Report Vol. 1-2. Prepared for the New Mexico-Texas Water Commission. 1994 June. e325pp.
11 13 Conjunctive Water Resource Management and Aquifer Restoration Study, Phases II and III. Prepared for the New Mexico-Texas Water Commission. 1994 June. e130pp.
11 14 Condition Assessment and Capacity Analysis Report for Westside Sanitary Sewer Interceptor, Central Avenue to South of Rio Dravo Boulevard. 1995 July. e200pp.
11 15 Study Report: Aquifer Storage and Recovery Investigation. Prepared for the New Mexico-Texas Water Commission. 1995 September. e55pp.
11 16-17 Correspondences and Draft Letters Relating to the Reconnaissance Level Evaluation of the Texas Diversion of Rio Grande Project Waters Near the New Mexico/Texas State Line. Prepared for the New Mexico-Texas Water Commission. 1995 November-1996 April. e200pp.
11 18 Well Site 26 Wellhead Treatment Design Criteria Memorandum: City of Clovis. 1995 December. e70pp.
11 19 New Mexico/Texas Joint Conveyance Facility for Rio Grande Project Water, Phase I Report for Joint Settlement Commission. Prepared for the New Mexico-Texas Water Commission. 1996. e60pp.
11 20 Appraisal Report Aquifer Storage and Recovery: Supplemental Investigations of Recharge Basins. Prepared for the New Mexico-Texas Water Commission. 1997 February. e35pp.
11 21 Critique of Existing Policies and Development of Policy Considerations for Working Draft Policy Evaluation Report, City Staff Steering Committee Review Draft. 1999 January 6. e75pp.
11 22 Hydrogeological Investigation for Radial Type Collector Wells in the Anthony/Canutillo Area. Prepared for the New Mexico-Texas Water Commission. 1999 January. e45pp.
El Paso-Las Cruces Regional Sustainable Water Project
12 1 Water Conservation Rates and Strategy Analysis, Component C--Long-Term Strategy: City of Albuquerque. c. 1999.
12 2 Concept Design of ASR Wellfield and Collection Facilities. Draft and final reports. Prepared for the New Mexico-TexasWater Commission. 1999 April-July. e55pp.
El Paso-Las Cruces Regional Sustainable Water Project
12 3 Construction Details and Economic Summary for NEPA Process Final Technical Memorandum. Prepared for the New Mexico-Texas Water Commission. 1999 December. e60pp.
El Paso-Las Cruces Regional Sustainable Water Project
12 4 Hydrologic Modeling Report Draft Final. Prepared for the New Mexico-Texas Water Commission. 2000 February. e200pp.
El Paso-Las Cruces Regional Sustainable Water Project
12 North Carolina.
12 5 Analysis of Alternative Water Supplies for Virginia Beach Final Report. 1992 June. e70pp.
12 6 Feasibility Study of Reclamation and Reuse of McAlpine Creek WWMF Effluent: Charlotte-Mecklenburg Utility Department. 1994 February 8. e50pp.
12 North Dakota.
12 7 Web Rural Water Development Project Summary Report. 1980 January. e150pp.
12 8-10 Engineering Preliminary Design Final Report for the Southwest Pipeline Project, North Dakota State Water Commission Vol. 2-4. 1982 September. e600pp.
12 Oklahoma.
12 11 Northwest and Western Oklahoma Hydrologic Study Rainfall/Runoff Analysis. 1987 October. e130pp.
12 12 Northwest and Western Oklahoma Hydrologic Study Phase 3 Salinity Investigation. 1988 February. e80pp.
12 South Dakota.
12 13 Contract Documents for Construction of Main Storage Reservoir Contract 1-7, Rural Water Development Project. 1984 August. e200pp.
12 Texas.
12 14-19 Operations and Maintenance Manual for Greenville Wastewater Reclamation Center E.P.A. Project No. C-48-1030-03 Vol. I and II. 1980 July. e800pp.
13 1 El Paso Water Resource Management Plan Study Phase II Completion Report Draft. 1990 August. e200pp.
13 2 El Paso Water Resource Management Plan Study Phase II Completion Report Final Draft. 1990 November. e200pp.
13 3 El Paso Water Resource Management Plan Study Database Abstracts. 1990 December 12. e200pp.
13 4 Rio Grande Project Texas-Mexico Conveyance System, A Reconnaissance Level Study. 1991 August. e35pp.
13 5 El Paso Water Resource Management Plan 1991-2040. 1991. e20pp.
13 6 El Paso Water Resource Management Plan Study Phase III Completion Report. 1992 February. e200pp.
13 7 El Paso Water Resource Management Plan, Feasibility Report on Wastewater Reuse Opportunities. 1992 August. e90pp.
13 8 El Paso Water Utilities Public Service Board, Assessment of Modeling of the Rio Grande Project System. 1993 November. e50pp.
13 9 Water Supply Fee Interim Report Demand Projections and CIP, El Paso Water Utilities Public Service Board. 1994 March 1. e20pp.
13 10 El Paso Water Utilities Public Service Board Water Facilities Master Plan Report. 1994 June. e200pp.
13 11 Reconnaissance Level Evaluation, Regulation Diversion and Aquifer Recharge of Rio Grande Project Waters: El Paso. 1996 April 18. e50pp.
13 12 Canutillo Wellfield Master Plan Final Report, El Paso Water Utilities Public Service Board. 1999 October. e80pp.
13 Utah.
13 13 Transportation Load Standards. c. 1980. 7pp.
13 14 Operations & Maintenance Manual Vol. 1, Jordan Valley Water Conservancy District. 2002 September. e150pp.
13 15 Preliminary Design Report for the 15000 South Pump Station Project, Metropolitan Water District of Salt Lake and Sandy. 2004 April. e250pp.
13 Wyoming.
13 16 Engineering Design Report on Level III Development Plan for Rehabilitation of the Wyoming No. 2 Canal, Riverton Valley Irrigation District, Fremont County. 1982 December 6. e80pp.
13 17 Engineering Design Report for the Level III Development Plan for Rehabilitation of the Wyoming No. 2 Canal, Riverton Valley Irrigation District. 1984 May. e50pp.
14 Egypt.
14 1-3 Ramses Agricultural Company Citrus Project Soil Suitability Intercropping Irrigation, Preliminary Design and Master Plan. 1979 March. e500pp.
14 4 Ramses Agricultural Company Citrus Project Groundwater Investigation. 1980 November. e100pp.
14 5 Alexandria General Organization for Sanitary Drainage, Consulting Engineering and Management Advisory Services. 1981 October. e200pp.
14 Jordan.
14 6 Tender Documents for Contract No. 2 Water Treatment Plant, North Jordan Domestic Water Supply Southern Region. 1981 June. e450pp.
14 7-8 Tender Documents for Contract No. 2 Phase A-Well Collection System Phase B-Water Treatment Plant, North Jordan Domestic Water Supply Northern Region, Vol. 1-2. 1983 June. e600pp.
14 9 Technical Proposal for the Wadi Araba Development Project. 1986 May. e400pp.
14 Miscellaneous.
14 10 Surge Analysis, a computer program for analysis of unsteady flow in a closed pipe system. 1975 October. e50pp.
14 11 Systems Drafting Manual for Architectural and Engineering Firms. 1980 January. e100pp.
14 12 Evaluation of Potential Sites for Seawater Desalting Demonstration Plants. 1980 August. e150pp.
14 13 Soils Report Information Requirements Guide. 1980 September. e10pp.
15 1 Culvert Design Program. 1981 February 23. e125pp. + 1 5.25 inch disk
15 2 Energy and Water in the 80's, Proceedings from a Seminar Presented at Santa Rosa, California. 1981 April 10. e40pp.
15 3 Quality Control Means Water Control. 1982 April 30. e30pp.
15 4 Engineering Services Hazardous/Toxic Waste Management Capabilities. 1984 February. e100pp.
15 5 Structural Design for Steel Water Tanks Including Seismic Design. 1984 May. e60pp.
15 6 Guideline for Soil Report Information Requirements. 1984 May. e20pp.
15 7 Computer Program Library, Computer Services Department. 1985 February. e60pp.
15 8 Nitrate Removal From Municipal Water Supplies. 1991 December. e30pp.
15 9-10 Piping, Valve, and Mechanical Equipment Data. 1993 May. e250pp.
15 11 BoyleNET Water Distribution Network Analysis for the PC. 1995 August. e200pp.
15 12 Guidelines for Soil Report Information Requirements. 1997 January 31. e55pp.
15 13 Compilation of Existing Policies and Development of Policy Considerations for Working Draft Policy Evaluation Report. 1998 November 4. e200pp.
15 14 Construction Phase Services Procedures Manual. 2002. e75pp.